- About Us
-
Departments
- Institutional
-
Industrial
- Introduction
- Superiority over Gurgaon
- Industrial Allotment Procedure
- List of Documents required for Sanction & Completion of Industrial Building Plans
- Existing Industries
- Restricted Industries
- Industrial Plot Allotment from 1/4/2015 to 7/9/2017
- Vacant Industry Plot list (Updated 7.10.2020)
- List of Non-Executive/Non-Functional Industries
- Building Plan Approval & Occupancy Certificates
- Public Notices and Office Orders
-
Residential
- Introduction
- Advantages - Living Here
- Residential - Allotment Procedure
- Approval of Building Plans
- Reservation of Residential Plots
- Residential Schemes Browser
- List of un-lease property (Residential & Built-up Flat/Houses)
- Residential FAQ
- List of Defaulter (Residential Plots/Builtup Flats/Houses)
- Public Notices and Office Orders
- IT & Biotech
-
Builders
-
Builders / GHS Projects List
- Aarcity
- AIG Park Avenue
- Ajnara Homes
- Ajnara Realtech Limited
- Amrapali Techzone-4
- Anthem Infrastructure
- Connoisseur Infrabuild
- Dhaniya Promoters
- Earth Towne
- Fusion Homes
- Galaxy Dream Home
- Galaxy International Real Tech
- Gaur City GC-4
- Gaur Atulayam
- Gaur City GC-2
- Gaur City Mall
- Gaur City School
- Gaur City (Layout Plan)
- Green Mansion
- HEBE Infra Structure
- Jyotirmay Infracon
- Mahagun India
- Panchsheel
- Paramount Emotions
- Rajesh Project India
- Supertech
- Ansal IT / SEZ Plot No - Techzone
- Group Housing Completion Up to Date (2019-23)
- Group Housing Completion Up to Date 11-05-2016
- Completion Certificate Objection - Group Housing/Builders
- Public Notices and Office Orders
-
Builders / GHS Projects List
- Commercial
-
Rural Abadi
- Notified Villages
- Farmer Corner / कृषक क्षेत्र
- Rural Abadi Regulations
-
Status of Village Development
- New Abadi plots planned from September to November 2017
- 2017-2018 में ग्रामवार कराये जाने वाले प्रस्तावित 6% आबादी भूखण्डों के विकास कार्य
- अर्जित भूमि के सापेक्ष कृषको को दिये जाने वाले आबादी भूखंड की पात्रता सूची (ग्रामवार)
- ग्राम-पाली के कृषको के आवंटन पत्र की सूची
- पट्टा प्रलेख द्वारा आबादी व्यवस्थापन के तहत पट्टा प्रलेख किये जाने के वाली भूमि की सूची (ग्रामवार)
- वित्तीय वर्ष 2017-18 मे ग्राम वार कराये जाने वाले प्रस्तावित ग्राम विकास कार्य
- ग्राम गुलिस्तानपुर के 6 % आबादी भूखंड जोकि ग्राम/सैक्टर पाली मे नियोजित किये गये हे के आवटन पत्र
- 6 प्रीतिशत व 10 प्रीतिशत आबादी भूखण्डों की संसोधित सूची
- Plan for Village Development
- Office order regarding Kisan Abadi Plot
-
Projects
- Construction Status of Projects
- Early Bird Projects
- Complementary Projects
- Details of works under progress for the year 2019-20
- Details of project work for 2018-19 (latest update)
- Office Order Work Distribution in Project Department
- Public Notices and Office Orders
- Details of works (under progress) for the year 2019-20
- Finance
-
Planning
- Outline Development Plan 2001
- Master Plan 2021
- Preparation of Master Plan 2021
- Greater Noida Master Plan 2021 (Revision)
- Regional Plan - 2021 & Land Use Breakup
- Comparison with UDPFI Guidelines (Under Revision)
- Documents Checklist for Building Plan for Different Schemes of GNIDA
- Completion Objection - Group Housing Plots
- Completion Objection - Village 6% Abadi Plots
- Sanction Building Plan Objection - Village 6% Abadi Plots
- Sanction Certificate Objection - Group Housing
- Public Notices and Office Orders
- Occupancy Certificate - Village Abadi 6%
-
Health
- Urban Services
- Skill Development
- HRD & Administration
- Legal
-
Information
-
Building Bylaws, Policy & Govt. Orders
- Revised Policy 2024 for the Installation of Mobile Tower(s)
- Building Bylaws
- U.P. Apartment Act
- Industrial Policy
- New Industries Plot Allotment Policy
- Special Economic Zones Policy
- Institutional Policy
- IT-ITES Policy
- Fecal Sludge and Septage Management (FSSM) Policy
- Decentralized Composting Policy
- Decentralised waste composting policy (2019)
- Construction and Demolition Waste Policy
- Commercial Policy
- Project Settlement Policy
- Zero Period Policy
- Sub Division Policy for 6% Plot
- Rural Abadi Regulations
- Complaint Redressal under U.P. RERA 2016
- U.P. Industrial Area Development Act
- Wayfinding Signage Policy
- Allotment of Religious Places - Terms, Conditions and Policy
- Public Notices, Office Orders, Due Dates, etc
- Defaulter Lists of GNIDA Allotees
- Penalty Calculations under Schemes
- Systems and Work Procedures
- Right to Information (RTI)
- Jewels of Greater Noida Stadium
- Related Websites & Links
-
Building Bylaws, Policy & Govt. Orders
-
Schemes
- Through E-Auction Online Bidding BPO/ITES Plots Scheme Code: BPO/ITES-0002/2024
- Residential Plots through E-Auction Online Bidding Scheme Code: LOP-04/2024
- IT/ITES Plots through E-Auction Online Bidding - Scheme Code - IT/ITES-0001/2024
- E-Auction of Institutional Plots Scheme Code - INS-04/2024
- E-Auction of Institutional Plots Scheme Code - INS-03/2023
- Commercial Shop/Office/Kiosk Scheme Code - CSK-1/2024-25
- Commercial Plots Scheme Code - CPS-3/2024-25 (4-FAR) through E-Auction / Online Bidding
- Commercial Plots Scheme Code - CPS-2/2024-25 (2-FAR) through E-Auction / Online Bidding
- Builder Plots through E-Auction Online Bidding - Scheme Code - BRS-1/2024-25
- Builder Plots through E-Auction Online Bidding - Scheme Code - BRS-02/2023
- Builder Plots through E-Auction Online Bidding - Scheme Code - BRS-01/2023-24
-
Online Services
- Account Status & Online Payments
- Allotee Online Services
- E-Tenders, RFP & EOI
- Public Notices, Office Orders, etc
- Ease of Doing Business Facilitators
- Citizen Charter Services
- Online GNIDA Search
- Online Map Submission & Completion
- Grievance Redressal
- Uttar Pradesh E-Tender Portal
- Tender Fee & Earnest Money deposit (EMD)
- Friends of GNIDA
-
Downloads
- Transfer Memorandum Forms
- One Time Settlement Scheme Application Form
- Application for Mutation of Residential Plot/Flat
- Application Form for Change of Address
- Form for Joint Name
- Mortgage Permission Form
- Bank Challan Form
- "Know Your Allottee" (KYA) Form (Updated)
- Form to seek information under RTI Act
- Lease Deed Format (Residential Plot)
- Possession Certificate (Residential Plot)
- Lease Deed Format (Built-up Housing Flat)
- Possession Certificate (Built-up Housing Flat)
- Lease Deed Format (Multistoreyed Flat)
- Contact
Helpline
Contact Helpline numbers as below:
Streetlight: 7982300721
Ganga Water
The proposed water supply scheme is based on the projected population under Master Plan 2021. The Scheme is being executed in three parts and the brief description of the scheme is mentioned below:-
i) For the withdrawal of 85 cusec Ganga water from Upper Ganga Canal at Dehra for Greater Noida, U.P. Irrigation Department has executed the works of lining of different canals/distributaries in approximately 9.95 lacs sqm. area and constructed a Head Regulator at Upper Ganga Canal at Dehra as deposit work. The above work has been completed 100%.
ii) For the distribution network of 85 cusec Ganga Water in different sectors of greater Noida the pipe line of dia from 200mm to 1400mm, of approximate length of 89.0 km, along with 25 nos. Under Ground Reservoir have been proposed and the work is being executed by UP Rajkiya Nirman Nigam Ltd. on PMC basis. At present pipe line approximately in the length of 70.0 km has been laid down and construction over 19 nos. UGRs are under progress. Approximately 80% work has been completed on site. Total cost of project is Rs. 318.00 crore.
iii) In this part of scheme the 1600 mm dia. Raw Water Conveyance Main will be laid down from intake point at Dehra to Water Treatment Plant near village Palla, the approximate length of this pipe line is 17.90 km. and Clear Water Conveyance Main from Water Treatment Plant near village Palla to Master Reservoir near sector KP-IV, which is approximately 5.10 km., Primary Treatment Works at intake point near village Dehra and 210 MLD capacity Water Treatment Plant near village Palla. For this project a loan of Rs. 220.25 crore has been sanctioned by NCRPB. At present NIT has been published and pre-bid meeting has been organized for these works. The approximate cost of project is Rs. 320.00 crore.